This project aims to set up a unit capable of significantly reducing (22%) the use of the public electricity distribution network for the consumption of public equipment. The interest of the project is to validate the coupling between an industrial use case and a PV power plant with storage on a first site to be then deployed on a large scale on the park of wastewater treatment plants of communities. The project includes a study of the sizing of the storage and the adjustment of the operation on a full-scale demonstrator. The innovation is based on the intelligent control of energy on a site with a particular typology. The project can have a start of operation (under study) at 4 months after obtaining the administrative authorizations.
Suivi de projet - Fin du projet : 1
Suivi de projet - Fin du projet : 2
Member partner
No member partner
E4V
Start of the project on04 / 11 / 2024
Strategic business lines
Smart grids
Bâtiments et territoires intelligents
Smart grids
Referent of the project
06 80 33 73 61
stephane.oury@s2e2.fr
Pays de la loire
The ZORG project aims to achieve a unified understanding of the links between zinc electrolyte…
The HyBer project is an ambitious initiative to create a hydrogen ecosystem in the department…