Currently, thanks to attractive feed-in tariffs, the production of photovoltaic installations is generally reinjected into the electricity distribution network. In the longer term, the objectives of factor 4 will encourage local consumption of locally produced energy. The main challenge lies in the design and sizing of intelligent systems capable of managing the production and consumption of the building so that it becomes partially or totally autonomous in energy. It is in this context that the DRIEA wished to initiate the realization of a demonstrator on its site of the street Miollis which makes it possible to highlight the interest of the self-consumption. The demonstrator will combine local photovoltaic generation, Lithium battery powered storage, low-power LED lighting and intelligent energy management technologies.

Retombées du projet

Action de communication : 1

Suivi de projet - Fin du projet : 5

Action de communication : 14

Publication scientifique : 5

Produit / Prototype : 20

Rapport final : 5

Personnes engagées sur le projet
Informations sur le projet

Fin du projet le 27 / 04 / 2024


Domaines d'activité stratégiques

Électronique : matériaux, composants et sous-systèmes


Référent du projet

PÔLE DE COMPÉTITIVITÉ S2E2

Ces projets pourraient vous intéresser

Retour aux projets

Consulter les appels à projets

Vous avez une idée de projet à développer ?

Découvrez les appels à projets

Je souhaite être accompagné !

Besoin d'un accompagnement pour vos projets ?

Demande d'adhésion